Principal Investigator:Heck, Darren M Licensed Year(s):
2013
2012 Summary:
The objectives of this project are:
a) Inventory of historical and ecological resources in the area;
b) past, present and future uses of the area by community residents;
c) identification of potential impacts of use of the land use areas supporting access and maintenance (i.e. camps, trails, buffer areas and work areas); and
d) provide follow-up mechanism for on-going communication of issues i...
Principal Investigator:Elliott, Milissa A Licensed Year(s):
2008
Summary:
This project seeks to identify and measure specific characteristics of plants to determine the current baseline conditions of the vegetation, collect grass samples to test for different species of fungi and integrate traditional knowledge of environmental systems with current biological sampling.
Transects (a long straight line) will be measured out from the edge of a road to about 1 km away fr...
Principal Investigator:Pawluk, Rick D Licensed Year(s):
2007
Summary:
The objective of the study is to collect Traditional Knowledge (TK) relevant to the Mackenzie Gas Project (MGP).
AMEC Earth & Environmental will coordinate the research. The Liidlii K’ue First Nation has been contracted to document Traditional Knowledge, including interviewing TK holders. Local researchers will be hired to collect and analyze data. A local translator will be hired to translat...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The Mackenzie Gas Project has sub-contracted the Fort Simpson Metis to collect and document Traditional Knowledge during the project. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of environmental protection plans. The Fort S...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is a continuation of traditional knowledge (TK) studies in the Fort Simpson area, which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. In 2004, Nogha Geomatics was a subcontractor to the MGP and local researchers were hired to undertake study tasks. Since December 2004, project management in Fort Simpson has shifted to the Liidli...