9 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Pine Point Railbed ESA
Principal Investigator: Nearing, Michelle
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.5047. The objective of the study is to determine environmental conditions (in particular metal concentrations) and to compare existing conditions on and near the Rail Bed to background. The proposed field program will focus on collecting information that is considered critical for completing a human health and ecological ri...


M-25 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


Modified Phase II Environmental Site Assessment O-35 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....


Modified Phase II Environmental Site Assessment N-01 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...


Modified Phase II-III Environmental Site Assessment F-36 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003 2002
Summary: The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...


Post Construction Water Quality Monitoring and Revegetation and Soil Monitoring for the Liard Pipeline and Gathering Project, Fort Liard, NT and Maxhamish Area, BC
Principal Investigator: Ferguson, Gordon
Licensed Year(s): 2003 2002
Summary: This monitoring program is designed to monitor water quality in the Liard pipeline study area and to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of 8 permanent sampling transects were...


Assessment of Stream Crossings for Planned Improvements to the Mackenzie Valley Winter Road.
Principal Investigator: Johnstone, Robin
Licensed Year(s): 1999
Summary: The proposed field program is designed to provide site-specific information on stream crossings, for planned improvements to the Mackenzie Valley winter road route. Researchers will travel to the crossing sites by helicopter from the closest community. At each crossing location, habitat assessments, water quality samples and fish census techniques (outlined in the DFO fisheries research permit) m...


Chevron Ft. Liard Potential Routing Selection Program
Principal Investigator: Machtans, Hillary
Licensed Year(s): 1999
Summary: The purpose of this study is to collect information about a variety ecosystems crossed by or in close proximity to the potential routes for a proposed pipeline. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies allong the proposed routes. Any fish collection will be outlined by Department of Fisheries and Oceans research permits...


Thor Lake Beryllium Project Environmental Baseline Study
Principal Investigator: Digel, Mark
Licensed Year(s): 1998 1997
Summary: Fisheries investigations, including habitat identification and possibly gill netting, will be conducted in the four small lakes located within the watershed of the orebody of the Thor Lake site. In lakes with fish, will collect 10 fish (up to two species) for chemical analysis. Fisheries investigations, including habitat mapping, gill netting (to verify fish community), will be undertaken in the...


TOTAL PAGES: 1