3 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2004 Terrestrial Studies in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. Local k...


Preconstruction biophysical site assessment (wildlife, vegetation) of potential well locations and flow line options within the Significant Discovery Area, and post-construction vegetation and permafrost monitoring on the Cameron Hills Gathering System
Principal Investigator: Hong, Tom
Licensed Year(s): 2002
Summary: A pre-construction biophysical site assessment will focus on wildlife and vegetation. The proposed well-sites will be examined on foot, and the flowlines walked to document vegetation types, including rare species if present. Main vegetation types will b...


Fisheries & Vegetation analysis for the Range Oil Fort Liard P66 Pipeline Project
Principal Investigator: Machtans, Hillary
Licensed Year(s): 1998
Summary: Fisheries and vegetation field work will begin in June 1998. Three small streams north of Fort Liard will be surveyed to determine if fish are present or absent and to assess the fish habitat in each creek. Two of these creeks are tributaries to the Liard River and are located near the P66 well site. Fisherman Creek, the tributary draining into Fisherman Lake from the Liard Range will also be surv...


TOTAL PAGES: 1