Principal Investigator:Carnochan, Stacey Licensed Year(s):
2023
Summary:
This licence has been issued for the scientific research application No.5579.
The proposed fieldwork will inform the baseline setting of the Canada Energy Regulator (CER) Application amendment on while also aiding in the development of feasible mitigation measures that will reduce potential effects that the Project may have on aquatic environments, wetlands, wildlife, and vegetation. As well, t...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
Summary:
This project is a continuation of socio-economic and traditional knowledge (TK) studies in the Trout Lake region which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus of the socio-ec...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
2002 Summary:
The research team will conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Deh Cho Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investigations initia...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...
Principal Investigator:Ferguson, Gordon Licensed Year(s):
2003
2002 Summary:
This monitoring program is designed to monitor water quality in the Liard pipeline study area and to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of 8 permanent sampling transects were...
Principal Investigator:Hong, Tom Licensed Year(s):
2002
Summary:
A pre-construction biophysical site assessment will focus on wildlife and vegetation. The proposed well-sites will be examined on foot, and the flowlines walked to document vegetation types, including rare species if present. Main vegetation types will b...
Principal Investigator:Harry, David Licensed Year(s):
1984
Summary:
A project directed toward the prediction and monitoring of geomorphic and geologic conditions along the route of the Norman Wells-Zama pipeline. Fieldwork will focus on observations of terrain performance along the pipeline ROW following the 1983/84 winter construction season....
Principal Investigator:McLaughlin, Ronald Licensed Year(s):
1978
Summary:
To study the effect linear developments (roads, pipelines and seismic lines) have on the northern ecosystems by: (1) documenting changes to the vegetation and terrain and comparing these areas with undistrubed areas. (2) selecting vegetation sample sites for next year's program. (3) sampling fish, small aquatic organisms ...
Principal Investigator:Davison, D.M. Licensed Year(s):
1975
Summary:
(1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....