11 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Pointed Mountain Pipeline Abandonment Project
Principal Investigator: Carnochan, Stacey
Licensed Year(s): 2023
Summary: This licence has been issued for the scientific research application No.5579. The proposed fieldwork will inform the baseline setting of the Canada Energy Regulator (CER) Application amendment on while also aiding in the development of feasible mitigation measures that will reduce potential effects that the Project may have on aquatic environments, wetlands, wildlife, and vegetation. As well, t...


Environmental Assessment for the Pine Point Mine
Principal Investigator: Mason, Kristine
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4731. To document existing environmental conditions at Pine Point to support upcoming development applications. Hydrology studies include the measurement of selected lake inflow and outflow and stream profile through field surveys, and installation of data loggers to continually monitor lake levels through the open-water...


Fish Habitat and Hydrotechnical Assessments along the Proposed Mackenzie Valley Highway
Principal Investigator: Chiperzak, Doug
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.5060. The goal is to collect baseline fish, fish habitat and hydrotechnical data for selected watercourses along the proposed Mackenzie Valley Highway to support engineering design and the regulatory process. Fish habitat will be assessed along 100 m reaches upstream and downstream of each potential watercourse crossing....


Taltson Twin Gorges Hydro Generating Facility Aquatic Effects Monitoring Program (AEMP) 2019
Principal Investigator: Miller, Matthew
Licensed Year(s): 2019
Summary: This licence has been issued for the scientific research application No.4565. The objective of this project is to conduct Aquatic Effects Monitoring. This will include three parts: 1) Riparian Habitat and Fish Usage Assessment. This is a study to monitor the trends and fluctuations of the aquatic environment along the riparian zones within the Taltson River from Nonacho Lake to Twin Gorges ...


Canadian Zinc - Prairie Creek Winter Access Road Fisheries Studies
Principal Investigator: Thomas, Craig J
Licensed Year(s): 2008 2005
Summary: Objectives of this research will be to confirm the presence or absence of fish habitat at stream crossings associated with the Prairie Creek Winter Access Road alignment and if present document fish habitat characteristics (physical). The information will support documentation requirements for the Department of Fisheries and Oceans relating to the Fisheries Act and the potential need for a Fisheri...


Environmental Assessment for AEC's proposed oil and gas development activities in the Sahtu, NWT
Principal Investigator: Machtans, Hillary
Licensed Year(s): 1999
Summary: The proposed field program is designed to provide information on fish habitat and wildlife in the area of three exploratory petroleum well sites and along their respective access routes in the Fort Liard/Nahanni Butte area. Researchers will travel to the well sites and along access routes sites by helicopter with survey work carried out by air, small boat and on foot. Fish habitat and water quali...


Environmental Assessment for Exploratory Drilling Project
Principal Investigator: Johnstone, Robin
Licensed Year(s): 1999
Summary: The proposed field program is designed to provide information on fish habitat and wildlife in the area of three exploratory petroleum well sites and along their respective access routes in the Fort Liard/Nahanni Butte area. Researchers will travel to the well sites and along access routes sites by helicopter with survey work carried out by air, small boat and on foot. Fish habitat assessments, wa...


Chevron Ft. Liard Potential Routing Selection Program
Principal Investigator: Machtans, Hillary
Licensed Year(s): 1999
Summary: The purpose of this study is to collect information about a variety ecosystems crossed by or in close proximity to the potential routes for a proposed pipeline. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies allong the proposed routes. Any fish collection will be outlined by Department of Fisheries and Oceans research permits...


Thor Lake Beryllium Project Environmental Baseline Study
Principal Investigator: Digel, Mark
Licensed Year(s): 1998 1997
Summary: Fisheries investigations, including habitat identification and possibly gill netting, will be conducted in the four small lakes located within the watershed of the orebody of the Thor Lake site. In lakes with fish, will collect 10 fish (up to two species) for chemical analysis. Fisheries investigations, including habitat mapping, gill netting (to verify fish community), will be undertaken in the...


Licence #2134
Principal Investigator: Katopodis, C.
Licensed Year(s): 1977
Summary: Topographic and hydrometric survey for the design of weirs to assit fish in entering culverts....


TOTAL PAGES: 2