Principal Investigator:Heck, Darren M Licensed Year(s):
2013
2012 Summary:
The objectives of this project are:
a) Inventory of historical and ecological resources in the area;
b) past, present and future uses of the area by community residents;
c) identification of potential impacts of use of the land use areas supporting access and maintenance (i.e. camps, trails, buffer areas and work areas); and
d) provide follow-up mechanism for on-going communication of issues i...
Principal Investigator:Mitrovic, Inya Licensed Year(s):
2012
Summary:
The objective of this research project is to determine how effective the public consultation processes utilized by Mackenzie Gas Project’s proponents (Imperial Oil Resources Ventures Limited, the Mackenzie Valley Aboriginal Pipeline Limited Partnership, ConocoPhillips Canada [North] Limited, Shell Canada Limited and ExxonMobil Canada Properties) were in addressing and meeting stakeholder interests...
Principal Investigator:Elliott, Milissa A Licensed Year(s):
2008
Summary:
This project seeks to identify and measure specific characteristics of plants to determine the current baseline conditions of the vegetation, collect grass samples to test for different species of fungi and integrate traditional knowledge of environmental systems with current biological sampling.
Transects (a long straight line) will be measured out from the edge of a road to about 1 km away fr...
Principal Investigator:Freeland Ballantyne, Erin A Licensed Year(s):
2008
2007 Summary:
The project facilitates the training of a youth researcher team in Fort Simpson and Tuktoyaktuk through a process of participatory video to learn with community members about the concerns and impacts of climate change and oil and gas development on well-being in the community.
The community will form a research team to guide the project, directed through youth-lead focus groups. Participants wi...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be carried out ...
Principal Investigator:Pawluk, Rick D Licensed Year(s):
2007
Summary:
The objective of the study is to collect Traditional Knowledge (TK) relevant to the Mackenzie Gas Project (MGP).
AMEC Earth & Environmental will coordinate the research. The Liidlii K’ue First Nation has been contracted to document Traditional Knowledge, including interviewing TK holders. Local researchers will be hired to collect and analyze data. A local translator will be hired to translat...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The Mackenzie Gas Project has sub-contracted the Fort Simpson Metis to collect and document Traditional Knowledge during the project. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of environmental protection plans. The Fort S...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The 2006 Traditional Knowledge Studies mark a continuation of Traditional Knowledge work initiated, as part of the Mackenzie Gas Project, with Katlodeeche First Nation in 2005. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of...
Principal Investigator:Van Stempvoort, Dale R. Licensed Year(s):
2005
Summary:
The objectives of this study are to 1) address information gaps with respect to groundwater quality and quantity along the proposed pipeline corridor; 2)gather groundwater information along the corridor between Fort Simpson and Great Bear Lake; 3) examine remediation processes for, and results of, petroleum spills in the north; and 4) help the Department of Transportation investigate potential gro...