Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be carried out ...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Smith, Lisa Licensed Year(s):
2003
Summary:
A network of permanent monitoring plots (PMPs) is required for assessing forest growth and yield in the NWT. These PMPs will be used to: 1) obtain information to assess the rate of forest growth and determine current and potential yield of various fores...
Principal Investigator:Hong, Tom Licensed Year(s):
2002
Summary:
A pre-construction biophysical site assessment will focus on wildlife and vegetation. The proposed well-sites will be examined on foot, and the flowlines walked to document vegetation types, including rare species if present. Main vegetation types will b...
Principal Investigator:Lamoureux, Scott F Licensed Year(s):
2002
Summary:
The objective of the research is to supplement and extend instrumental climatological and hydrological records in the NWT using dendrochronology (tree-ring) and varved lake sediment analysis. Transportation to the site will be by charter aircraft from Fo...