Mackenzie Corridor Phase III Aeromagnetic Survey

Régions: Inuvialuit Settlement Region

étiquettes: physical sciences, geology, electromagnetic survey

chercheur principal: Kiss, Frank (7)
Nᵒ de permis: 13090
Organisation: NRCan Geophysical Survey of Canada
Année(s) de permis: 2003 2002 2001 2000 1999
Délivré: mars 28, 2000
Équipe de projet: Joan Tod, Airborne geophysical survey contractor

Objectif(s): The purpose of this study is to improve the public knowledge and understanding of the geology of this area, as no publicly available magnetic survey coverage exists. Survey lines will be flown at a spacing of 800m and a 200m mean terrain clearance (where

Description du projet: The purpose of this study is to improve the public knowledge and understanding of the geology of this area, as no publicly available magnetic survey coverage exists. This survey is entirely airborne, with no land access. The aircraft will be equipped with a state of the art magnetometer and navigation systems, including Global Positioning System (GPS). The aircraft will be operating from the Inuvik airport. All survey data will eventually be made available through the GSC Geophysical Data Center.