Principal Investigator:Goad, Robin E Licensed Year(s):20172016201420132012201120102009
2008
2006200520042003 Summary:
The objective of this study is to conduct environmental surveys in the area surrounding the NICO Project camp and along the proposed routes of an all-weather access road and a transmission line to the Snare River Hydroelectric station.
The scope of the studies will include fish and fish habitat, hydrology and water quality surveys. Site visits by field staff and assistants will be made during...