2 Dossier(s) trouvé(s) pour le chercheur principal "Marsh, Philip" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:Marsh, Philip Année(s) de permis:200520042003200220012000
1999
19981997199619951994199319921990 Résumé:
The Trail Valley Creek site will be accessed by Twin Otter, helicopter and snowmobile, while the Havikpak Creek site will be accessed by foot and snowmobile. We plan to have a small field crew at each site to measure the amount of snow on the ground in the middle of April, and to again return to measure snow melt and the streamflow in mid to late May. Actual timing of the spring melt trip will dep...
chercheur principal:Marsh, Philip Année(s) de permis:19931992
1991
Résumé:
The research will study changes in the water levels of a variety of lakes in the Mackenzie Delta. Investigations will include consideration of factors controlling the lake levels, introduction of floodwater from the Mackenzie River, rainfall on to the lake, smowmelt runoff into the lakes and evaporation from the lakes....