Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
This program will investigate five potential sources of granular materials and subsurface drilling at the proposed Storm Hills Pigging Facility. It is estimated that the program will require up to 90 days to complete. Up to 45 persons are expected to wor...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Information fro...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Information fro...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Aerial reconnai...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Aerial reconnai...
Principal Investigator:Graburn, Larry Licensed Year(s):2005
2004
Summary:
The geotechnical site investigation program involves drilling or excavating to collect soil samples at specific sites. This work includes drilling approximately 74 boreholes or excavations at 23 sites (18 granular deposit sites, 4 overland sites, and 1 r...
Principal Investigator:Graburn, Larry Licensed Year(s):
2003
Summary:
This study will gather information to assess the soil and ground conditions at representative frost heave study sites within the municipal boundaries of the Town of Norman Wells. The information will be used in assessing the feasibility of a pipeline in...
Principal Investigator:Graburn, Larry Licensed Year(s):
2003
Summary:
The proposed activities form part of a Summer Field Geotechnical Investigation Program to be conducted in the Deh Cho Region during 2003. The objective of this program is to gather information that will assess the soil and ground conditions at a represe...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...