Environmental Assessment for Exploratory Drilling Project
Principal Investigator: Melton, Derek
Licensed Year(s): 1998
Summary: The objective of the study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the project area has been started. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife observations (ma...


Environmental Assessment for Exploratory Drilling Project
Principal Investigator: Melton, Derek
Licensed Year(s): 1998
Summary: The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the proposed project area has been initiated. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife obser...


Grey Wolf Norman Wells Drilling Project
Principal Investigator: Melton, Derek
Licensed Year(s): 1998
Summary: Golder Associates was contracted on behalf of Grey Wolf Exploration to conduct preliminary baseline studies at Grey Wolf's proposed well sites. The objective of this study is to determine the presence or absence of fish and wildlife in the vicinity of the proposed project site. A literature search for registered archaeological sites within the proposed site is also planned. Golder Associates was c...


Wildlife and Fisheries Habitat Survey at Ranger Oil's Exploratory Drilling Project near Tulita (Fort Norman).
Principal Investigator: Melton, Derek
Licensed Year(s): 1997
Summary: Main objective is to establish baseline wildlife & fisheries habitat conditions prior to start of Ranger Oil's winter exploration drilling program. All sampling will be done over a 2-3 day period in mid-September. Three well sites are planned for drilling. Well site 1 is near Nota Creek & accessed by the Norman Wells-Tulita winter road plus an existing short cutline. Well site 2 is near Bear Rock ...