Principal Investigator:Melton, Derek Licensed Year(s):
1997
Summary:
Main objective is to establish baseline wildlife & fisheries habitat conditions prior to start of Ranger Oil's winter exploration drilling program. All sampling will be done over a 2-3 day period in mid-September. Three well sites are planned for drilling. Well site 1 is near Nota Creek & accessed by the Norman Wells-Tulita winter road plus an existing short cutline. Well site 2 is near Bear Rock ...
Principal Investigator:Gnieser, Christopher H. Licensed Year(s):
1989
Summary:
The researcher will study about 20 sites along the outlined winter road for assessment of potential terrain disturbances....
Principal Investigator:Bliss, Lawrence Licensed Year(s):
1978
Summary:
(1) Study of growth paterns of evergreen shrubs in a low shrub tundra, evaluate winter roads and salt water spills at well sites. (2) Life history study of the grass, Alopecurus alpinus, a study of the cold hardiness of certain high arctic plants and a study of natural ground slumps....