3 record(s) found with the tag "wildlife habitat" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2002 Terrestrial Studies in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required along the study corridor. This flight will be used to identify sites for detailed sampling. Sites will be selected to represent the major ecological land units. Where possible, sample sites will be grouped to reduce helicopter time....


2002 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify sites for detailed sampling. Sites will be selected to represent the major ecological land units. Where possible, sample sites will be grouped to...


Vegetation Survey for the Ikhil Gas Development
Principal Investigator: Sutor, Greg
Licensed Year(s): 1997
Summary: Vegetation communities along the pipeline route and over other parts of the Project area would be provisionally mapped from aerial photographs. A field survey would be undertaken with an emphasis on identifying rare plants. The study area is in the Caribou Hills IBP site 4-9, which was in part proposed because of its rare flora. July is an optimum time for a single survey. Also transect sampling ...


TOTAL PAGES: 1