Principal Investigator:Johnson, Pascale Licensed Year(s):2006
2005
200420032002 Summary:
The Pointed Mountain Gas Plant, six associated wellsites, and the airstrip are being assessed during the decommissioning process. The site was initially constructed in 1966. The plant has been shut down since September 2001. The Pointed Mountain field has had soil, groundwater, and surface water assessed since 1990. Previous environmental work and public consultation at this site have identifi...
Principal Investigator:Green, Jeff Licensed Year(s):
2001
Summary:
The proposed research program will be carried out on Crown Lands located within the Sahtu Settlement Area. The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys on Crown Lands located within the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections. Helicopters...
Principal Investigator:Green, Jeff Licensed Year(s):
2001
Summary:
The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys of the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections. Helicopters will fly at elevations greater than 100 m above ground level (AGL), although at some sites, it may be necessary to fly at lower altit...