3 dossier(s) trouvé(s) portant l’étiquette "riverbank erosion" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:Couture, Rejean Année(s) de permis:2006
2005
Résumé:
The main objectives of the field reconnaissance at landslide sites are as follows:
o To visit landslide sites that exhibit on-going movement in order to qualify the rate of movement;
o To identify main failure mechanisms and factors that contributed to slope failures;
o To validate previous data collected through airphoto interpretation and remote sensing techniques;
o To collect soil samples ...
chercheur principal:Povey, Andrew Année(s) de permis:
2004
20032002 Résumé:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. Local k...
chercheur principal:Povey, Andrew Année(s) de permis:2005
2004
20032002 Résumé:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...