2 record(s) found with the tag "lithology" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2006 Great Bear River Seismic Test Program in the Sahtu Settlement Area - Tulita District
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2006
Summary: The objective of the program is to collect information regarding the surficial geology of the Great Bear River at the location of the proposed pipeline watercourse crossing. This information will be used to determine the depth to bedrock as part of the information for a river crossing design, and for use in the design of a proposed horizontal directional drill (HDD) crossing at this location. S...


Snowbird Lake Mapping Project
Principal Investigator: Martel, Edith
Licensed Year(s): 2004
Summary: The mapping team (5-6 researchers) will be flown out by floatplane from Yellowknife in early June and a camp will be established. Island campsites are preferred as a deterrent against bear encounters. With the aid of zodiac-style inflatable boats, the re...


TOTAL PAGES: 1