3 record(s) found with the tag "land reclamation" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Pine Point Mine reclamation research plan - tailings impoundment area
Principal Investigator: Fraser, Paul
Licensed Year(s): 2018
Summary: In accordance with the Mackenzie Valley Land and Water Board (MVLWB) Guidelines, the overarching closure goal for former mine sites is to return the site and affected areas to viable, and wherever practicable, self-sustaining ecosystems that are compatible with a healthy environment and with human activities. To meet this closure goal, companies must demonstrate that a site is physically stable, c...


Post Construction Water Quality Monitoring and Revegetation and Soil Monitoring for the Liard Pipeline and Gathering Project, Fort Liard, NT and Maxhamish Area, BC
Principal Investigator: Ferguson, Gordon
Licensed Year(s): 2003 2002
Summary: This monitoring program is designed to monitor water quality in the Liard pipeline study area and to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of 8 permanent sampling transects were...


Phase 3 Environmental Baseline Program, Diavik Diamond Project, Lac de Gras, NWT
Principal Investigator: Digel, Mark
Licensed Year(s): 1996 1995
Summary: Methods of data collection will include water quality and bottom sampling in Lac de Gras and Lac du Sauvage; automatic and manual water level recordings; bathometric work; automatic weather stations and the monitoring of air-borne particles and visibility; continuation of baseline studies of soils and terrain, and vegetation; fish population, habitat, health, and spawning habits studies; baseline ...


TOTAL PAGES: 1