4 record(s) found with the tag "hydro-electric" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Fish Habitat Study in Water Course from Bluefish Hydro Dam to Bluefish Trailrace
Principal Investigator: Jacobson, Toni Lynne
Licensed Year(s): 1996
Summary: Transportation to Bluefish Hydro Electric Plant is by boat from the Miramar Con Mine Dock at Prosperous Lake. Two one day field trips to the Plant are scheduled during the collection period. Equipment to be utilized include gill or seine nets, Gee traps, backpack electrofishing unit, water flow meter, water sample bottles, canoe and outboard motor. Sample species include whitefish, lake trout, ...


Slave River basin fish study
Principal Investigator: Ash, Gary R.
Licensed Year(s): 1981
Summary: To identify major environmental concerns of the proposed Hydroelectric development as related to fish....


Licence #2539
Principal Investigator: McCart, Peter
Licensed Year(s): 1980
Summary: As part of the Slave River Hydro Study to conduct a continuing assessment of the fisheries resources of the area. life histories of the fish populations will be recorded. Basic data will be gathered on the aquatic habitat. The resource will also be evaluated as to its local, regional and national significance....


Licence #2007
Principal Investigator: Chang-Kue, Ken T.J.
Licensed Year(s): 1976
Summary: Investigate the fish population in order to accurately define the fisheries resource and critical aspects of their life cycle with reference to the impact of a proposed hydroelectric project....


TOTAL PAGES: 1