Principal Investigator:Jasper, J.N. Licensed Year(s):
1976
Summary:
To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....
Principal Investigator:Guyomarch, Miss Pascale Licensed Year(s):
1976
Summary:
Geomorphological studies of a reconnaissance nature and will emphasize rock weathering, cliff retreat and permafrost conditions within 10 miles of the townsite....
Principal Investigator:French, Hugh Licensed Year(s):
1976
Summary:
Banks Island: Geomorphological Investigations - ground ice, pingos, mass-wasting and spring runoff will be investigated at sites in the Sachs and Upper Kellett drainage systems. Holman Island: Geomorphological studies will be of a reconnaissance nature and will emphasize rock weathering, cliff retreat and permafrost conditions within 10 miles of townsite....
Principal Investigator:Goth, David Licensed Year(s):
1976
Summary:
1) To collect data on seasonal snow depths, densities and temperatures, 2) To collect snow samples for pollen measurement, 3) To make observations on the presence of erratics and weathering on exposed rocks, 4) To compile a daily records of precipitation, temperature, cloud ...
Principal Investigator:Davison, D.M. Licensed Year(s):
1975
Summary:
(1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....