2 dossier(s) trouvé(s) portant l’étiquette "environmental feasibility" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

2002 Baseline Air Quality Volatile Organic Compound (VOC) Monitoring Program in the Taglu and Parsons Lake Production Areas
chercheur principal: Povey, Andrew
Année(s) de permis: 2002
Résumé: Imperial Oil Resources, Aboriginal Pipeline Group, Conoco Canada Resources Ltd, Shell Canada Ltd, and ExxonMobil Canada initiated a number of Biophysical Baseline Studies during 2001 as part of a feasibility study for the Mackenzie Gas Project. This pro...


Reconnaissance Surveys to Select Sample Sites for Detailed Biophysical Surveys in the Inuvialuit Settlement Region: Biophysical Baseline Studies in Support of the Mackenzie Delta Gas Feasibility Study.
chercheur principal: Green, Jeff
Année(s) de permis: 2001
Résumé: The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys of the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections (outside sensitive sites identified by the HTCs and archaeological sites identified by information obtained from the Prince of Wales Northern Heri...


TOTAL PAGES: 1