2003 Winter Baseline Noise Monitoring Program in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...


2003 Winter Baseline Noise Monitoring Program in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at two potential sites for a compressor station near Travaillant Lake. These data will provide estimates of background ambient noise, which is needed before construction of the Mackenzie Gas Project. The proposed monit...


2003 Winter Baseline Noise Monitoring Study in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003 2002
Summary: Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...


2002 Baseline Air Quality Volatile Organic Compound (VOC) Monitoring Program in the Taglu and Parsons Lake Production Areas
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary: Imperial Oil Resources, Aboriginal Pipeline Group, Conoco Canada Resources Ltd, Shell Canada Ltd, and ExxonMobil Canada initiated a number of Biophysical Baseline Studies during 2001 as part of a feasibility study for the Mackenzie Gas Project. This pro...


2002 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary: The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify...


2002 Terrestrial Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary: The proposed research program involves terrestrial studies in the Gwich'in Settlement Area to be conducted during 2002. Initial Vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification...


2002 Terrestrial Studies in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary: The proposed research program involves terrestrial studies in the Inuvialuit Settlement Area to be conducted during 2002. Initial vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classificatio...


Ambient Air Quality Study in the Vicinity of Inuvik: Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002 2001
Summary: Ambient air quality data will be collected to the northeast of the Community of Inuvik. Monitored parameters will include sulfur dioxide, nitrogen oxides and ozone. These data will be collected by a series of passive sampling devices, that will require servicing on a monthly basis. The sample media will be changed out at the end of each month, and returned to the laboratory for detailed chemica...


Summer 2001 Hydrology Surveys Within the Sahtu Settlement Region: Biophysical Baseline Studies in Support of the Mackenzie Delta Gas Feasibility Study
Principal Investigator: Sawetsky, Les
Licensed Year(s): 2001
Summary: A detailed data collection program will be undertaken on all major streams in the proposed pipeline corridor. The proposed survey will begin in mid-September and continue until late December, 2001 and will consist of comprehensive studies at selected streams, as discussed below, to define how the streams behave and how they change in time. The focus of the hydrology component is on describing h...


2001 Fish and Fish Habitat and Water Quality Surveys: Sahtu Settlement Area
Principal Investigator: Metikosh, Serge
Licensed Year(s): 2001
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located on Crown Land along the tentative pipeline corridor in the Sahtu Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller ...