3 dossier(s) trouvé(s) portant l’étiquette "Inuvialuit Settlement Region" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

2003 Route and Site Selection in the Inuvialuit Settlement Region
chercheur principal: Povey, Andrew
Année(s) de permis: 2005 2004 2003 2002
Résumé: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region. During the flights, locations of important land features will be confirmed by...


2003 Spring, Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
chercheur principal: Povey, Andrew
Année(s) de permis: 2005 2004 2003 2002
Résumé: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...


2003 Winter Baseline Noise Monitoring Study in the Inuvialuit Settlement Region
chercheur principal: Povey, Andrew
Année(s) de permis: 2003 2002
Résumé: Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...


TOTAL PAGES: 1