Regions: Inuvialuit Settlement Region, Gwich'in Settlement Area
Tags: physical sciences, climatology, weather, magnetic field
Principal Investigator: | Sofko, George J (9) |
Licence Number: | 14150 |
Organization: | ISAS, Dept. of Physics & Eng. Phys., Univ. of Saskatchewan |
Licensed Year(s): |
2013
2012
2011
2010
2009
2008
2007
2004
|
Issued: | Apr 30, 2007 |
Project Team: | Dr. A. V. Koustov, Dr. Kathryn McWilliams, Dr. Glenn Hussey, Dr. Dieter Andre, Dr. John MacDougall, Dr. Frances Fenrich, Dr. Eric Donovan, Dr. J-P St-Maurice, Dr. Masakazu Watanabe, Dr. Robert Rankin, Dr. Ian Mann, Dr. Andrew Yau |
Objective(s): The radar network is designed to measure voltage patterns several hundred kilometers above the ground, as these patterns project out into space along the Earth's magnetic field lines. Just as high and low pressure systems drive normal weather, high and low voltages drive space weather.
Project Description: The radar network is designed to measure voltage patterns several hundred kilometers above the ground, as these patterns project out into space along the Earth's magnetic field lines. Just as high and low pressure systems drive normal weather, high and low voltages drive space weather. This information is critical to personnel in space and to maintenance of satellite telecommunications. The radar installation is rather simple, requiring transmitting and receiving electronics in a small building, and antennas outside. The radar requires a local Field Technical Support Officer for routine checks, regular maintenance operations and for special maintenance when problems with the electronic and antenna systems arise. During the construction phase, the University of Saskatchewan SuperDARN engineer, Jan Wiid, will require a team to install the antennas – this should last no longer than a month in 2007. The researchers are willing to provide seminars and talks in the NWT. All scientific publications resulting from the project will be made available to the Aurora Research Institute. Fieldwork will be conducted from July 23 to December 31, 2007 at LOT 8, PLAN 50540, GROUP 1355, Inuvik (68º24’52”N, 133º46’11”W).