Principal Investigator:Evans, Marlene S. Licensed Year(s):
2008
Summary:
This licence is issued for the scientific research application #861.
This study is designed to examine streams possibly affected by the proposed Mackenzie Gas Project pipeline and streams that can serve as future control/reference sites. The researcher will measure the following: nutrients and metals in stream water, stream water quality (DO, pH, conductivity, etc.), and aquatic invertebrate ab...
Principal Investigator:Schryer, Rick P. Licensed Year(s):
2006
Summary:
Sampling of water, sediment, benthic invertebrates, fish inventories, and fish habitat mapping will be done. Water will be collected for chemical analysis, and limnology measurements taken. Sediment will be collected for chemical analysis and particle size analysis. Benthic invertebrates will be collected for taxonomic identification. Fish species, presence and relative abundance will be determine...
Principal Investigator:Mears, Margaret Licensed Year(s):
2000
Summary:
Western was contracted on behalf of Paramount Resources to conduct preliminary baseline studies at Paramount's land holdings, and a proposed access corridor in the Cameron Hills area. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A preliminary survey of the physical, chemical and biological features of the...
Principal Investigator:Pattenden, Rick Licensed Year(s):
1996
Summary:
The field program will be conducted during three sampling periods (spring, summer and fall). Lakes and streams in the immediate vicinity of the potential mine site will be examined. Sampling techniques will include angling, snorkeling, backpack electrofishing, beach seining, minnow traps and gill netting for fish. Plankton nets and eckman dredges will be used to collect plankton and benthic mac...