5 record(s) found in the location "South Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2008 Baseline studies for Avalon Ventures Ltd. proposed Thor Lake Rare Earth Metals Project (Terrain component)
Principal Investigator: Sibbald, Carey
Licensed Year(s): 2009 2008
Summary: This licence is issued for the scientific research application #912. The objective of this research is to provide baseline information on the terrain in and around the Thor Lake area. Filed observations will allow the researchers to produce a terrain map of the Thor lake area. To do this, the land must be categorized based on landforms, mineral deposits, drainage, slopes and geohazards (fo...


Gahcho Kué Project – Soils and Terrain Baseline Studies
Principal Investigator: Robertson, Scott
Licensed Year(s): 2007
Summary: The overall objective of this project is to collect additional Soil and Terrain information for use in the environmental assessment of the De Beers Canada Inc. proposed Gahcho Kué Project. De Beers Canada Inc. has been conducting Soils and Terrain baseline studies for a number of years in the area of the Gahcho Kué Project. The studies planned for this year will add to the Terrain and Soils ba...


Seasonal Overland Winter Road
Principal Investigator: Hoos, Rick
Licensed Year(s): 2007
Summary: A new 156 km winter road is proposed, extending from the end of the Ingraham Trail to Lockhart Lake, following a route similar to that of the existing winter road. The objective is to acquire airborne digital imagery (including LiDAR and digital video) data to produce maps; to determine fish presence/absence in streams around the route and fish utilization of habitat, to determine potential fish h...


Fort Resolution Traditional Knowledge Survey for the Pine Point Pilot Project
Principal Investigator: Swisher, Sara S
Licensed Year(s): 2010 2006
Summary: The purpose of this study is to obtain traditional knowledge from Fort Resolution aboriginal residents, focussing on individuals aged 45 years or older. The information will be used for planning, and incorporated into the Developer’s Assessment Report (DAR) as required by the Mackenzie Valley Environmental Impact Review Board's (MVEIRB) Environmental Assessment Process. Interviews will be ut...


Taltson River Hydro Power Supply to Snap Lake Diamond Mine Environmental Baseline Studies
Principal Investigator: Sharpe, Seßn
Licensed Year(s): 2003
Summary: This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...


TOTAL PAGES: 1