Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2006
Summary:
The objective of the program is to collect information regarding the surficial geology of the Great Bear River at the location of the proposed pipeline watercourse crossing. This information will be used to determine the depth to bedrock as part of the information for a river crossing design, and for use in the design of a proposed horizontal directional drill (HDD) crossing at this location.
S...
Principal Investigator:Narbonne, Guy Licensed Year(s):
2001
19991998199619941992199119891988 Summary:
The research team will be flown from Norman Wells to the base camp near Shale Lake by helicopter. The camp will consist of one sleeping tent and one cooking tent. The research team will walk to several rock sections with 3 km of the base camp. Data collection will consist of measuring rocks with a ruler, taking photographs, and collecting up to 50 small (fist-sized) pieces with a hammer. The r...