23 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT
Principal Investigator: Smith, Sharon S
Licensed Year(s): 2023 2022 2021 2020 2019
Summary: This licence has been issued for the scientific research application No.5419. This project continues the on-going monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT. This phase of the project is largely data collection. Objectives are to provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature and active la...


Permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT
Principal Investigator: Smith, Sharon S
Licensed Year(s): 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006
Summary: This project continues the on-going monitoring program of permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT. This phase of the project is largely data collection. The specific objectives are: 1) to provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature and permafrost active layer thickness) and ...


Enbridge Pipelines (NW) Inc. Traditional Knowledge Study
Principal Investigator: von Kuster, Jenica
Licensed Year(s): 2013 2012
Summary: The objectives of this project are: a) to take an inventory of historical and ecological/environmental resources in the area; b) to identify past, present and future uses of the area by community residents; c) to identify potential impacts from use of land within the land use area; and d) to provide follow-up mechanism for on-going communication of issues identified. The principal researche...


GEM Great Bear magmatic zone/iron oxide copper-gold deposit project
Principal Investigator: Corriveau, Louise
Licensed Year(s): 2011 2010 2009
Summary: The objectives of the Great Bear/IOCG geoscience research and mapping project are to: • develop a modern geological, crustal architecture and exploration framework for polymetallic iron oxide-copper-gold (IOCG) deposit-type mineralizing systems in the Great Bear magmatic zone and new exploration methods for IOCG deposits in glaciated terrains; • validate deposit-type model for known mineral occu...


Addressing Internal Challenges and Barriers to Enhance the Representation of Aboriginal Values and Interests in Regional Land Use Planning
Principal Investigator: Mak, Ida YL
Licensed Year(s): 2010
Summary: The ultimate objective is to determine ways for Aboriginal communities and organizations to optimize their participation in land use planning in the NWT. Ideally this will result in land use plans that will reflect the values and interests of the communities that they intend to serve. The first goal is to identify the internal challenges and barriers that Aboriginal communities and organization...


Land Use and Regulatory Permitting - Colville Lake Airport
Principal Investigator: Koke, Paul Koke E
Licensed Year(s): 2009
Summary: The objective of this study is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain, vegetation, and proximity and access to the community. The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to relocate and expand the Colville Lake Airport. As a result, it is required that a...


Sahtu Karst Study
Principal Investigator: Skelton, Jennifer
Licensed Year(s): 2007
Summary: The Northwest Territories contains numerous unique landforms known as karst topography. The objective of this study is to know the locations and characteristics of karst sites in the Sahtu, providing information for environmental assessment of future developments and for land-use planning. Karst topography is an unique landform; the environmental impacts on the land and water of various land uses...


2006-2007 Biophysical and Reconnaissance Studies in the Sahtu Settlement Area
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes. Route and site reconnaissance will be performed by...


Enhancement of Permafrost Monitoring Network and Collection of Baseline Terrain Information in the Mackenzie Valley Corridor - K'asho Got'ine District, Sahtu Settlement Area
Principal Investigator: Smith, Sharon S
Licensed Year(s): 2006
Summary: Twelve sampling sites in the K'asho Got’ine District of the Sahtu Settlement Area have been selected for this project, with preferred locations chosen near existing winter roads and the C.N.T. trail for continuous site accessibility and to minimize disturbance to the environment. One or two boreholes up to 20 m in depth will be drilled at each site in order to capture local environmental variabili...


2006 Traditional Knowledge Studies with the Katlodeeche First Nation
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The 2006 Traditional Knowledge Studies mark a continuation of Traditional Knowledge work initiated, as part of the Mackenzie Gas Project, with Katlodeeche First Nation in 2005. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of...


TOTAL PAGES: 3