3 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Mackenzie Valley Highway Project Description Report
Principal Investigator: Johnson, Mary Ann
Licensed Year(s): 2011
Summary: The objective of this project will be to verify baseline environmental information available for the highway route. The field program will focus on a flyover of the proposed highway route to verify the baseline information that is available for potential fish and wildlife habitat as well as plant communities. The environmental field program will be conducted at the same time as the archaeological ...


Licence #2001
Principal Investigator: Jasper, J.N.
Licensed Year(s): 1976
Summary: To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....


Licence #1869
Principal Investigator: Davison, D.M.
Licensed Year(s): 1975
Summary: (1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....


TOTAL PAGES: 1