Principal Investigator:Chin, Krista Licensed Year(s):
2017
2016201520142013 Summary:
Objective 1: Build a partnership between government, communities, regulators and researchers to develop a watershed-based cumulative impact study in areas of oil and gas exploration in the Sahtu region.
The Sahtu Renewable Resource Board (SRRB) can play an important coordinating role in bringing partners together and working with the communities to determine appropriate engagement in the projec...
Principal Investigator:Moffitt, Morgan E Licensed Year(s):
2015
Summary:
The objective of this research project is to describe and document local people’s experiences and perspectives of oil and gas development in the context of past and present industry activity and traditional knowledge. This research seeks to understand and demonstrate the complexity of Tulít’a peoples relationships with the land and with industry. What are the experiences of local people, how does ...
Principal Investigator:Lennie-Misgeld, Peter Licensed Year(s):
2011
2010 Summary:
The main objective of the program is to collect fisheries and environmental baseline information to better understand the environmental characteristics of the Great Bear River and to support potential future development of hydropower on the Great Bear River. The program is not being conducted to support a specific project as there are no hydropower projects planned for the Great Bear River at thi...
Principal Investigator:Millman, Peter M Licensed Year(s):
2007
2006 Summary:
The objective of this project is to identify geophysical anomolies that will warrant additions to exploration activity (seismic surveys).
Three helicopters will be required for this project. Two Hughes 500’s will be used as longline helicopters to collect gravity data. The Hughes 500 is ideal for this longline operation as the helicopter is small and maneuverable. The third support helicopte...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be performed by...
Principal Investigator:Little, Lois M. Licensed Year(s):
2006
Summary:
The NWT is on the cusp of unprecedented change as the global capital machine in the form of the Mackenzie Gas (pipeline) Project (MGP), a massive hydrocarbon development, mobilizes to roll through the territory. The unparalleled scale and size of the MGP and the industrial activity that it will ignite will likely stress every element of the northern ecosystem. Women and the social and cultural spa...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope and the C.N.T. Trail, north of Fort Good Hope. A temporary rig camp will be established near the Town of Fort Good Hope. The camp will be able to accommodate up to 60 people. Secondary access to the investigation sites and potential water sources will follow existing cutlines, rights-of-way, and trails w...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2006
2006
Summary:
Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of the existing winter road and Little Smith Creek. Each camp will be able to accommodate up to 60 people. Secondary access to the investigation sites and potential water sources will follow existi...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2006
Summary:
The objective of the program is to collect information regarding the surficial geology of the Great Bear River at the location of the proposed pipeline watercourse crossing. This information will be used to determine the depth to bedrock as part of the information for a river crossing design, and for use in the design of a proposed horizontal directional drill (HDD) crossing at this location.
S...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The 2006 Traditional Knowledge Studies mark a continuation of Traditional Knowledge work initiated, as part of the Mackenzie Gas Project, with Katlodeeche First Nation in 2005. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of...