2 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

EL462 & EL463 2013-2015 Surface and Groundwater Monitoring Program
Principal Investigator: Hansen, Ken
Licensed Year(s): 2015 2014 2013 2012
Summary: The study is to continue establishing the groundwater and surface water conditions within the exploration licences prior to and during oil and gas exploration activities. Surface Water Quality Sample Collection Collect surface water samples once, during September 2015, from a reduced number of sampling locations targeted near areas where exploration activities have occurred. The water sampl...


2006 Biophysical and Reconnaissance Studies in the Sahtu Settlement Area
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies. Route and site reconnaissance comprise: verification of the ...


TOTAL PAGES: 1