Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
During this study, activities conducted will include vegetation mapping, rare plant surveys, rare plant mitigation planning, timber cruising, and landform, soil and permafrost investigations.
Vegetation mapping surveys will consist of visual observations from a helicopter to confirm vegetation types for mapping. These surveys will be conducted in conjuction with rare plant surveys. Sampling equi...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Sahtu Settlement Area. Surveys of fish and fish habitat will be made at 62 permanently flowing watercourses, as well as 15 intermittent streams. These studies will include hydrology and water quality work as well. All of the aquatic ...