7 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

How are changes on the land affecting water resources around Fort Good Hope and Ts’ude Niline Tuyeta?
Principal Investigator: Comte, Jerome
Licensed Year(s): 2024
Summary: This licence has been issued for the scientific research application No. 5930. This project proposes to evaluate responses of aquatic ecosystems to permafrost thaw, lake drying, and wildfire, as well as their cumulative impacts. Lake chemistry and biological diversity (microbes and invertebrates) in water (current environmental change) and in sediments (historical change) will be characterized,...


Assessing regulators' information needs to make decisions regarding cumulative effects under the MVRMA
Principal Investigator: Noble, Bram F
Licensed Year(s): 2018 2017 2016
Summary: This project will determine what information Regulators require about cumulative effects or conditions in order to make informed decisions regarding development impacts to water quality in the NWT, and whether and how that information is, or can be, provided through NWT Cumulative Impacts Monitoring Program (CIMP) or other agencies responsible for monitoring. The objectives are as follows: 1)...


Establishing a watershed framework for assessing cumulative impacts of development
Principal Investigator: Chin, Krista
Licensed Year(s): 2017 2016 2015 2014 2013
Summary: Objective 1: Build a partnership between government, communities, regulators and researchers to develop a watershed-based cumulative impact study in areas of oil and gas exploration in the Sahtu region. The Sahtu Renewable Resource Board (SRRB) can play an important coordinating role in bringing partners together and working with the communities to determine appropriate engagement in the projec...


Environmental Studies for EL470 - 5yr
Principal Investigator: Belland, Darlene
Licensed Year(s): 2017 2016 2015 2014 2013 2012
Summary: The objective of this project is to conduct ongoing monitoring and assessment programs, including areas in the Mackenzie River Special Management Zone (SMZ), for surface water. Surface water samples will be collected from selected lakes, ponds, rivers, and streams. Selected water bodies in EL470 have already undergone bathymetric assessment and sampling. ConocoPhillips will communicate, in ...


Establishment of Permanent Monitoring Plots in the NWT
Principal Investigator: Smith, Lisa
Licensed Year(s): 2005
Summary: The Permanent Monitoring Plots will provide experimental data on forest growth and progression, cumulative impact monitoring, and will provide data for territorial and national reporting requirements. Most plots will be accessed only by helicopter. At each site, a 400 square metre plot (11.28 m radius) will be established with rebar as a centre post. All trees, shrubs and other vegetation will...


2003 Port Radium: Phase 2 Environmental Studies
Principal Investigator: MacNeill, Scott W
Licensed Year(s): 2003
Summary: This 5-day sampling program will involve fisheries, aquatic, and vegetation studies at/in the vicinity of the abandoned Port Radium Mine site. Concentrations of five biologically significant metals (antimony, arsenic, lead, nickel and zinc) will be dete...


2001 Fish and Fish Habitat and Water Quality Surveys: Sahtu Settlement Area
Principal Investigator: Metikosh, Serge
Licensed Year(s): 2001
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located on Crown Land along the tentative pipeline corridor in the Sahtu Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller ...


TOTAL PAGES: 1