Principal Investigator:Blaschuk, Katherine Licensed Year(s):
2011
20102009 Summary:
WorleyParsons, on behalf of Imperial Oil, began a benthic invertebrate and fisheries assessment program for the portions of Bosworth Creek adjacent to the Imperial Oil operations in Norman Wells, NWT. The objective of the project is to characterize biophysical conditions in Bosworth Creek in the area surrounding the lower Bosworth Creek Bridge; both upstream and downstream from the location of a f...
Principal Investigator:Mochnacz, Neil Licensed Year(s):
2001
2000 Summary:
Transportation to and from sampling sites will be provided by helicopter. Basic camping equipment will be set up for a few days in each sampling location for sleeping and eating during sampling. All fish captured will be tagged with colored tags (floy tags) and some (2-5) with radio-tags to identify fish movement and locate spawning sites. Fish will only be sampled to collect information on dis...
Principal Investigator:Melton, Derek Licensed Year(s):
1997
Summary:
Main objective is to establish baseline wildlife & fisheries habitat conditions prior to start of Ranger Oil's winter exploration drilling program. All sampling will be done over a 2-3 day period in mid-September. Three well sites are planned for drilling. Well site 1 is near Nota Creek & accessed by the Norman Wells-Tulita winter road plus an existing short cutline. Well site 2 is near Bear Rock ...