6 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

De Beers Canada Snap Lake Mine Environmental Monitoring 2021
Principal Investigator: McLean, Sarah C
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4858. The objective of the project is to conduct environmental monitoring of wildlife (incidental observations only), vegetation, air quality, hydrology, and aquatics in the Snap Lake study area. Methods used are outlined in the management and monitoring plans (aquatic effects monitoring program, water management plan [s...


Baseline Data Collection, Courageous Lake Gold Project, Seabridge Gold Inc.
Principal Investigator: Weagle, Ken V
Licensed Year(s): 2005 2004
Summary: The purpose of this study is to collect environmental baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board for the development of a gold mine at the Seabridge Gold Inc. property. The components of the program u...


Gahcho Kue' Biophysical Baseline Studies
Principal Investigator: Bekhuys, Tim
Licensed Year(s): 2006 2005
Summary: De Beers Canada has conducted a number of baseline studies in the Gahcho Kue' area, and is continuing these studies in 2005. AMEC Earth and Environmental will be doing the baseline studies on behalf of De Beers. The studies will consist of wildlife, fi...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Taltson River Hydro Power Supply to Snap Lake Diamond Mine Environmental Baseline Studies
Principal Investigator: Sharpe, Seßn
Licensed Year(s): 2003
Summary: This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...


Fortune Minerals Nico and Dianne Lake Baseline Survey
Principal Investigator: Schryer, Rick P.
Licensed Year(s): 1998
Summary: The objective of these studies is to determine the presence or absence of fish and wildlife in the vicinity of the proposed project area. A literature search for registered archeological sites within the proposed project area is also planned. A literature review will be done to document any existing information on fish populations in the region. A preliminary survey of physical, chemical and biolo...


TOTAL PAGES: 1