6 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Vegetation Productivity on the Bathurst Caribou Range
Principal Investigator: Danby, Ryan K
Licensed Year(s): 2019 2018
Summary: The two main objectives are: to map changes in vegetation productivity on an annual basis across the Bathurst caribou herd’s range using satellite imagery obtained from NASA’s MODIS sensor (available since 2000) and analyze these data to identify where the most significant changes have occurred; and to collect and analyze data on the growth, establishment, and mortality of shrubs and trees over th...


Baseline Monitoring of Arctic Vegetation and Snow Changes over the Bathurst Caribou Habitat using Satellite Remote Sensing and Community-based Field Observations
Principal Investigator: Chen, Wenjun
Licensed Year(s): 2014 2013
Summary: The goals of this research project are: 1. To fill the information gap on Bathurst caribou summer range conditions using satellite remote sensing data and community-based ground vegetation monitoring 2. To develop a cumulative impact assessment method that makes cumulative impact assessment possible even if data are incomplete and provides timely feedback for guiding the refinement of monitoring...


2010 Baseline Environmental Studies, Nechalacho Rare Earth Element Project Site
Principal Investigator: Moore, Steve M
Licensed Year(s): 2010
Summary: The 2010 baseline environmental studies will include the following: 1) A rare plant survey to be conducted in mid July (approximate) to identify presence of rare plants within the local study area. 2) An ecosystem mapping field component to be carried out in June and mid July (approximate) to describe existing habitat types within the local study area. Rare plant surveys will be conducted in ...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Izok Project Environmental Baseline Studies
Principal Investigator: Hubert, Ben
Licensed Year(s): 2002
Summary: The purposes of these studies are to update the environmental baseline data set for the Izok Project in preparation for submitting a project proposal for developing the orebody at Izok Lake. This study focuses on a mineral deposit in Nunavut. The project...


Genetic Variation and Population Structure in Boreal and Subarctic Mire Sedges (Carex, Cyperaceae)
Principal Investigator: Waterway, Marcia J.
Licensed Year(s): 1990
Summary: The Researcher and her team will sample approximately twenty different species of sedges in a range of wetlands between Edmonton and Yellowknife. They will find out the range of conditions in which each species grows best and will determine whether broad tolerance results from inherited variability or from the ability of individuals of each species to tolerate different conditions....


TOTAL PAGES: 1