3 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Damoti Lake Gold Project Environmental/Engineering Baseline Study.
Principal Investigator: MacDonald, Gord
Licensed Year(s): 1997
Summary: Activities at the Damoti Lake Project Site will be as follows; 1) Archaeology - short site visit with field survey, 2) Terrestrial work will emphasize vegetation types and their value as wildlife habitat. Specific surveys for signs of moose, furbearers, raptors and other species, 3) Aquatic studies will emphasize habitat values in both lake and stream locations. Water quality work, 4) Hydrology w...


Environmental Baseline Program Colomac Area (Indin Lake), N.W.T.
Principal Investigator: Kalich, Laura
Licensed Year(s): 1996
Summary: The work will include seven aspects of research. Water quality will be done through a number of sampling locations at different times of the year. A hydrology study will measure high water discharge and stage measurements at seven streams in the vicinity of the proposed all-weather road. Bathymetric surveys will conducted on lex lake and six smaller un-named lakes in the vicinity of the propos...


Planning study of Northern Native Communities
Principal Investigator: Pin, Gino
Licensed Year(s): 1996
Summary: Will conduct community consultation workshops in the 4 case study communities: Rae-Edzo, Snare Lake, Ft. Resolution and Kakisa. The workshops will open to the entire community. Data collection will be by open meeting discussion, individual interviews and interactive activity stations. The study is an evaluation of the level of success of existing planning and housing practice for native communi...


TOTAL PAGES: 1