5 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Ekati Diamond Mine
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2022
Summary: This licence has been issued for the scientific research application No.5107. The main objectives of the field work for 2022 will be to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality, and to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collected unde...


Ekati Engineering and Environmental Monitoring Programs
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4886. The main objectives of the field work for 2021 will be to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality; and to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collected unde...


Damoti Gold
Principal Investigator: Hamm, Sharleen
Licensed Year(s): 2007 2006
Summary: Exploration efforts at the Damoti Lake property (concentrating on the Horseshoe Zone) are intended to improve gold-bearing ore estimates at the site. As part of the pre-feasibility work, alternatives for tailings disposal will be studied, including depositing tailings into natural water bodies (Lardass Lake, Unnamed Lake, Pond 1 and 2), and/or using land-based methods, such as thickened tailings a...


Taltson River Hydro Power Supply to Snap Lake Diamond Mine Environmental Baseline Studies
Principal Investigator: Sharpe, Seßn
Licensed Year(s): 2003
Summary: This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...


Gazelle Lake and Point Lake Preliminary Baseline Study
Principal Investigator: Bryant, Wayne
Licensed Year(s): 1998
Summary: The Gazelle environmental baseline study will include specific investigations on water/sediment quality, lake bathymetry, limnology, catchment hydrology, fisheries and fish habitat assessment. Field data collection and observations will take about two to three days. Field staff of 3 will be transported by air to Ekati from Yellowknife. From Ekati, helicopter transport will be used to drop off the...


TOTAL PAGES: 1