Principal Investigator:Dahl-Fequet, Monica L Licensed Year(s):
2005
Summary:
The objective of this project is to collect biological and hydrological information on Hill Creek. It is unknown as to whether or not the culvert at the Hill Creek highway crossing is large enough to allow for the spring migration of spawning fish. The researchers will collect fisheries and habitat information on Hill Creek. This data will include fish presence/absence, lifestage and species com...
Principal Investigator:Thomas, Craig J Licensed Year(s):
1998
Summary:
This study is to identify existing habitat characteristics of the potential and existing stream and pond crossings of the Highway #3 reconstruction project. Field studies will involve the identification of fish habitat characteristics, the potential identification of present fish species in those systems that suggest fish habitat is present by using seine netting techniques. Background data search...
Principal Investigator:Jacobson, Toni Lynne Licensed Year(s):
1996
Summary:
Transportation to Bluefish Hydro Electric Plant is by boat from the Miramar Con Mine Dock at Prosperous Lake. Two one day field trips to the Plant are scheduled during the collection period. Equipment to be utilized include gill or seine nets, Gee traps, backpack electrofishing unit, water flow meter, water sample bottles, canoe and outboard motor. Sample species include whitefish, lake trout, ...