7 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Subarctic Lakes in a Changing Climate (SLACC) - Lake studies in the Yellowknife area
Principal Investigator: Palmer, Mike
Licensed Year(s): 2024 2023
Summary: This licence has been issued for the scientific research application No.5531. The overarching objective of this program is to take an ecosystem approach to assessing how multiple environmental stressors impact aquatic habitats in subarctic shield terrain. There are three central activities that will be undertaken with this license and they are designed to address the specific objectives below: ...


Shoal Habitat Utilization Study
Principal Investigator: Morrison, Scott
Licensed Year(s): 2007 2006 2005 2004
Summary: Consistent with the DFO authorization, the major objectives of the study are to provide annual documentation of shoal habitat use by Lake Trout in the vicinity of the mine site, and to ground truth hydroacoustic equipment. Study locations for 2005 are as per 2004. Hydroacoustic surveys are to be conducted during the early morning or evening hours. The survey is conducted at the same time each...


Proposed Monitoring Plan - Matthews Lake and Area Fish Habitat Restoration and Enhancement Project
Principal Investigator: Brewin, Kerry M
Licensed Year(s): 2005
Summary: The purpose of this study is to collect biological information from both the control sites and the treatment sites within Matthews Lake and the surrounding area. The objective is to monitor these sites and collect enough information to evaluate the effectiveness of the 2004 habitat enhancement and construction activities. Field crews will fly to Matthews Lake, landing either on the runway or th...


Environmental Effects Monitoring for Miramar Con and Giant Mines
Principal Investigator: Caughill, Dave
Licensed Year(s): 2004 2003
Summary: The main objective of this study is to characterize environmental conditions and supplement existing environmental information for possible use in long-term (i.e., multi-year) Environmental Effects Monitoring (EEM) programs as required of the Giant and C...


2002 Beartooth Lake Fish-Out Program
Principal Investigator: Chubb, Derek
Licensed Year(s): 2002
Summary: The objective of the study is to remove all fish from Beartooth Lake prior to dewatering and in a manner which respects community concerns raised in previous public stakeholders meetings. The study will 1) quantify fish production, fish habitat, and prod...


Desperation Pond and Carrie Pond Fish Transfer Program
Principal Investigator: Armstrong, Allison
Licensed Year(s): 2001
Summary: The capture and processing of fishes, including biological data collection, sample analysis, and recording of field data are the responsibility of BHP based on DFO approved methods described herein. The Project Biologist will be at site during crew training, to participate in the collection of data and to ensure the quality of data. The Project Biologist will also be responsible for collating an...


2001 Fish Habitat Assessments for Future Mine Road Developments
Principal Investigator: Moore, Peter
Licensed Year(s): 2001
Summary: Fish will be collected and released live using seining and electro-fishing techniques. Data collection will also include flow monitoring. All assessments will be completed on watercourses within the Misery Road, Sable Lake Road and Fox Lake Road developments within the mine site. BHP will provide support staff which will include people hired locally....


TOTAL PAGES: 1