3 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is a continuation of work that began in 2004. The Niglintgak Gas Processing facility may be constructed on a seaworthy barge, transported to a staging site in the Beaufort Sea, and then towed through the Mackenzie Delta channels to a sheltered location in Little Kumak Channel where the barge set-down site is proposed. This study will look at the environmental conditions along the pro...
Principal Investigator:Blasco, Steve M Licensed Year(s):200920082007200620052004
2003
Summary:
This Beaufort Seabed Mapping Project is designed to assess the environmental impact of offshore hydrocarbon exploration and transportation on the renewable resources of the Beaufort Sea. This project has 3 objectives: 1) seabed sampling using grab sample...
Principal Investigator:Hequette, Arnaud Licensed Year(s):
1993
19921991 Summary:
The research will involve the survey of cliffs and beaches located along the shoreline of the Tuktoyaktuk Peninsula near Atkinson Point. This information will assist in determining if the shoreline has changed. Measurements will also be taken for water depth in the nearby lagoons and bays. Sediments will be collected from all sites visited for further laboratory analyses....