32 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Derksen, Chris Licensed Year(s):
2013
2012 Summary:
The proposed European Space Agency Earth Explorer 7 CoReH20 satellite mission has the primary objective of retrieving snow water equivalent (SWE) over land at a high spatial resolution (200-500 metres) from X- and Ku-band Synthetic Aperture Radar measurements. This would make available high resolution, satellite derived SWE, for monitoring and modeling applications. To-date, airborne measurements ...
Principal Investigator:Soare, Richard J Licensed Year(s):
2009
2007200620052004 Summary:
The objective of this research is to compare the formation processes of pingo-like mounds near the equator in Mars vs. the development of pingos in the Tuktoyaktuk Coastlands, and evaluate whether the two mounds types could be similar.
Mars is a high-priority target for the Canadian and international planetary science communities. The main driver for this is the possibility of life on the Red P...
Principal Investigator:Neufeld, Lori Licensed Year(s):
2009
Summary:
WorleyParsons, on behalf of Imperial Oil, is planning to conduct a remote sensing pilot project through use of a fixed-wing aircraft to capture environmental information on approximately 100 former drilling sites, as well as some former staging areas, campsites, artificial islands in the Beaufort Sea and other facilities located in the Northwest Territories. The purpose of the project is to determ...
Principal Investigator:Lane, Larry S Licensed Year(s):
2008
Summary:
This study will be composed of an assessment field trip as well as a larger field study used to teach the regional geology to geologists who work for companies that currently hold petroleum leases in the Delta area. The trip in July will serve as a scoping trip to prepare for the field trip by assessing specific sites for suitability as field trip stops. Every site will be evaluated for its scien...
Principal Investigator:Lesack, Lance Licensed Year(s):
2008
2007 Summary:
The aims of the various components of this project are to develop a hydraulic model for the Mackenzie Delta by observation of ice jams for calibration of the model, assessing ice cover and breakup patterns, linking an ice-ocean-atmosphere model of storm surges to the hydraulic model, measuring water stored in off-channel areas, improving information on lake-flooding for off-channel areas, quantify...
Principal Investigator:Henderson, Bob C. Licensed Year(s):
2007
Summary:
The objective of this research program is to collect topographical information relating to the potential for: (a) a winter access road for the transport of large modules from the east channel of the Mackenzie River, from the vicinity of the mouth of Pete's Creek and the Lucas Point area, to the proposed Parsons Lake north pad site; (b) a barge anchorage location on the east channel of the Mackenzi...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008.
Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...
Principal Investigator:Kim, Jae Licensed Year(s):
2007
2006 Summary:
The objective of this program is to ground-truth (survey) routes and collect topographical and meteorological information relating to proposed access roads. Winter access roads will go to the Parsons Lake North pad from Tuktoyaktuk and from the mouth of Pete's Creek. The all season roads will go from the north pad to the gravel resource and to the airstrip, as well as the airstrip itself.
Snow ...
Principal Investigator:Chiperzak, Doug Licensed Year(s):
2006
Summary:
Biophysical and heritage resource surveys will take place in late summer and fall, and contribute to the assessment of a potential development projects (the Tuk 2 M-18 well site and connecting pipeline to Parsons Lake and the Mackenzie Gas Pipeline) located in the Tuktoyaktuk Peninsula, about 12 km southeast of Tuktoyaktuk and 125 km northeast of Inuvik.
The field assessment will involve four s...
Principal Investigator:Couture, Réjean Licensed Year(s):
2006
2005 Summary:
The goal of this project is to compile updated baseline information/knowledge on the types, regional distribution, and controls (e.g. forests fires, climate change) of landslides. The main objectives of the field reconnaissance at landslide sites are six-fold: 1) to validate previous data collected through air photo interpretation and remote sensing techniques; 2) to carry out detailed mapping at ...