4 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Seligman, Ben Licensed Year(s):2007
2006
Summary:
Helicopter flights will take place for site reconnaissance in the Niglintgak field area. The surveys will locate various features with GPS, photographs, and video, including land near major water courses, unique features (e.g. patterned ground), and problem areas. Re-survey of existing lease boundaries at Camp Farewell will be done. Optimal sites for infrastructure and water resources will be dete...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (north) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...
Principal Investigator:Green, Jeff Licensed Year(s):
2001
Summary:
The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys of the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections. Helicopters will fly at elevations greater than 100 m above ground level (AGL), although at some sites, it may be necessary to fly at lower altit...