25 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
2003 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has three co...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted within the Niglintgak, Taglu and Parsons Lake Leases as well as at select potential locations for facilities, infrastructure, access roads and granular resources in the Inuvialuit Settlement Region where there is the po...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
Imperial Oil Resources, Aboriginal Pipeline Group, Conoco Canada Resources Ltd, Shell Canada Ltd, and ExxonMobil Canada initiated a number of Biophysical Baseline Studies during 2001 as part of a feasibility study for the Mackenzie Gas Project. This pro...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
The proposed research program involves terrestrial studies in the Inuvialuit Settlement Area to be conducted during 2002. Initial vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classificatio...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The proposed research program involves terrestrial studies in the Gwich'in Settlement Area to be conducted during 2002. Initial Vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification was essentially completed in the Gwich'in Settlement Area. Vegetation studies during 2002 will focus on locating areas of rare or uncommon plants...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Gwich'in Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
2001 Summary:
Ambient air quality data will be collected to the northeast of the Community of Inuvik. Monitored parameters will include sulfur dioxide, nitrogen oxides and ozone. These data will be collected by a series of passive sampling devices, that will require servicing on a monthly basis. The sample media will be changed out at the end of each month, and returned to the laboratory for detailed chemica...
Principal Investigator:Green, Jeff Licensed Year(s):
2001
Summary:
The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys of the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections. Helicopters will fly at elevations greater than 100 m above ground level (AGL), although at some sites, it may be necessary to fly at lower altit...