4 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Mutua, Daniel Licensed Year(s):
2010
Summary:
Objectives are to:
1. Design and test zero-head hydro-electric turbines under low flow, i.e. less than 1 m/sec velocity, for the purpose of utilizing locally available renewable hydro resources;
2. Solar/Hydrogen fuel cell testing;
3. Evaluate the feasibility of an NWT-based commercial venture to manufacture and sell these turbines, and/or integrated energy systems.
In rivers where ther...
Principal Investigator:Sherstone, David A. Licensed Year(s):1993
1992
199119901988 Summary:
Ice gauges are installed on river ice once the ice is strong enough to support researchers (20 gauges for the Mackenzie Delta and 15 gauges for Hay River). These gauges are read every 10 days to obtain total ice thickness, white ice thickness and snow depth. From these data, the rates of ice growth and decay can be calculated, and the approximate date of maximum ice thickness can be determined....
Principal Investigator:Boyes, Donald M. Licensed Year(s):19951994
1990
Summary:
The Researcher and team propose to provide a better understanding of the present fluvial regime in the area and a method of assessing the effects of uncontrollable influences such as global warming and controllable factores such as hydro-electric and pipeline development....
Principal Investigator:Hirst, S.M. Licensed Year(s):
1981
Summary:
To put in place a series of automatic water level recorders (14 recorders in 8 locations) as part of assessing possible downstream environmental impacts as a result of proposed hydro- electric developments on the Liard River....