4 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Renewable energies: Design and Testing Zero-head Micro hydro turbine,Solar/Hydrogen fuel cell testing
Principal Investigator: Mutua, Daniel
Licensed Year(s): 2010
Summary: Objectives are to: 1. Design and test zero-head hydro-electric turbines under low flow, i.e. less than 1 m/sec velocity, for the purpose of utilizing locally available renewable hydro resources; 2. Solar/Hydrogen fuel cell testing; 3. Evaluate the feasibility of an NWT-based commercial venture to manufacture and sell these turbines, and/or integrated energy systems. In rivers where ther...


Northern River Ice Regimes
Principal Investigator: Sherstone, David A.
Licensed Year(s): 1993 1992 1991 1990 1988
Summary: Ice gauges are installed on river ice once the ice is strong enough to support researchers (20 gauges for the Mackenzie Delta and 15 gauges for Hay River). These gauges are read every 10 days to obtain total ice thickness, white ice thickness and snow depth. From these data, the rates of ice growth and decay can be calculated, and the approximate date of maximum ice thickness can be determined....


Modelling Flooding Hydrology on the Mackenzie Delta with Remote Sensing and Geographic Information Systems
Principal Investigator: Boyes, Donald M.
Licensed Year(s): 1995 1994 1990
Summary: The Researcher and team propose to provide a better understanding of the present fluvial regime in the area and a method of assessing the effects of uncontrollable influences such as global warming and controllable factores such as hydro-electric and pipeline development....


Licence #2670
Principal Investigator: Hirst, S.M.
Licensed Year(s): 1981
Summary: To put in place a series of automatic water level recorders (14 recorders in 8 locations) as part of assessing possible downstream environmental impacts as a result of proposed hydro- electric developments on the Liard River....


TOTAL PAGES: 1