4 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Chiperzak, Doug Licensed Year(s):
2006
Summary:
Biophysical and heritage resource surveys will take place in late summer and fall, and contribute to the assessment of a potential development projects (the Tuk 2 M-18 well site and connecting pipeline to Parsons Lake and the Mackenzie Gas Pipeline) located in the Tuktoyaktuk Peninsula, about 12 km southeast of Tuktoyaktuk and 125 km northeast of Inuvik.
The field assessment will involve four s...
Principal Investigator:Biggar, Kevin Licensed Year(s):
2006
2005 Summary:
Since the 1970s, the oil and gas industry has drilled at least nineteen exploratory wells in the Kendall Island Bird Sanctuary. Observations at associated drilling mud-sumps have been made; however, there remains a paucity of field data describing site conditions. It is also appreciated that construction of the proposed Mackenzie Valley pipeline will stimulate the development of Niglintgak and Tag...
Principal Investigator:Kokelj, Steven V Licensed Year(s):2006
2005
Summary:
Since the 1970's, the oil and gas industry has drilled at least 19 exploratory wells in the Kendall Island Bird Sanctuary (KIBS), but there is a shortage of field data describing environmental conditions at the well-sites and drilling-mud sumps. In Marc...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...