6 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Bird, Sam P Licensed Year(s):
2011
Summary:
The objective of this research project is to collect supplementary soil and water samples to further delineate areas of the site affected by hydrocarbons, metals and salinity and to assess area for possible impacts where infrastructure has been removed.
Soil samples will be collected with hand tools and placed in ziplock bags to roughly measure hydrocarbons while in the field and into glass ja...
Principal Investigator:Moorman, Brian J Licensed Year(s):
2010
Summary:
The main objective of this study is to establish the degree of impact and spatial extent of specific oceanic storm surges within the coastal Mackenzie Delta over the past 40 years. This investigation will be completed by analyzing remote sensing imagery to create multiyear change maps. The resulting maps will then be correlated to historic water level and climate data and verified by field samples...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is a continuation of work that began in 2004. The Niglintgak Gas Processing facility may be constructed on a seaworthy barge, transported to a staging site in the Beaufort Sea, and then towed through the Mackenzie Delta channels to a sheltered location in Little Kumak Channel where the barge set-down site is proposed. This study will look at the environmental conditions along the pro...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study is for esta...
Principal Investigator:Sawetsky, Les Licensed Year(s):
2001
Summary:
A detailed data collection program will be undertaken on 20 streams. All major streams will be included in the survey. The proposed survey will begin in late July and continue until early September 2001, and will consist of comprehensive studies at selected streams, as discussed below, to define how the streams behave and how they change in time. The focus of the hydrology component is on descr...
Principal Investigator:Jasper, J.N. Licensed Year(s):
1975
Summary:
Measurement of peak stream flows and assessment of environmental conditions at stream crossings along the Mackenzie Highway....