4 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Inuvialuit Settlement Area. The research team will survey 14 permanent watercourses, as well as several intermittent or seasonal watercourses and approximately 20 lakes located along the study corridor to determine aquatic characteri...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...
Principal Investigator:Whitney, Paul Licensed Year(s):
1975
Summary:
Survey all streams to be crossed by the proposed Foothills Pipeline, conduct aerial and ground surveys of rare and endangered species, and inspect all stockpile and comprssor stations and wharfing sites associated with the proposed pipeline for Foothills Pipeline....