5 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Seligman, Ben Licensed Year(s):
2007
2006 Summary:
The proposed fieldwork is an expansion of previous years' fieldwork to develop a suitable knowledge base for planning and development. In addition, some routine maintenance at Camp Farewell will be conducted. The majority of the proposed work is planned for the Niglintgak area and is focused around the Gas Conditioning Facility (GCF) and the Horizontal Directional Drilling (HDD) crossing site, as ...
Principal Investigator:Green, Jeff Licensed Year(s):
2001
Summary:
The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys of the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections (outside sensitive sites identified by the HTCs and archaeological sites identified by information obtained from the Prince of Wales Northern Heri...
Principal Investigator:Washuta, A.S. Licensed Year(s):
1993
1992 Summary:
The information gathered at the ten NWT DEW Line Sites will be used to prepare detailed Contract Documents for each site's environmental clean up. During the site visits, the researchers will conduct overall site surveys and identify areas or structures requiring either clean up or demolition. The sites to be visited are Nicholson Pen., Clinton Pt., Cp. Young, Byron Bay, Jenny Lind Isl., Gladman...
Principal Investigator:Steen, J.W. Licensed Year(s):
1977
Summary:
Beaufort Sea Shoreline Reconnaissance Project; findings to be incorporated into the "Coastline of the Beaufort Sea" Atlas....