27 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
Imperial Oil Resources, Aboriginal Pipeline Group, Conoco Canada Resources Ltd, Shell Canada Ltd, and ExxonMobil Canada initiated a number of Biophysical Baseline Studies during 2001 as part of a feasibility study for the Mackenzie Gas Project. This pro...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
The proposed research program involves terrestrial studies in the Inuvialuit Settlement Area to be conducted during 2002. Initial vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classificatio...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The proposed research program involves terrestrial studies in the Gwich'in Settlement Area to be conducted during 2002. Initial Vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification was essentially completed in the Gwich'in Settlement Area. Vegetation studies during 2002 will focus on locating areas of rare or uncommon plants...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Gwich'in Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...
Principal Investigator:Green, Jeff Licensed Year(s):
2001
Summary:
The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys of the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections. Helicopters will fly at elevations greater than 100 m above ground level (AGL), although at some sites, it may be necessary to fly at lower altit...
Principal Investigator:Bush, Dana Licensed Year(s):
2001
Summary:
The BC Terrestrial Ecosystem Mapping inventory standard will be used to provide a uniform method of describing vegetation, soil and terrain based on air photo interpretation and field data collection. The sites will be contained within a 1 km corridor with 'bulges' in areas of special concern such as river crossings. Surveying sites accessed by helicopter, boat, vehicle and/or on foot. To avoid c...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...
Principal Investigator:Sawetsky, Les Licensed Year(s):
2001
Summary:
A detailed data collection program will be undertaken on 20 streams. All major streams will be included in the survey. The proposed survey will begin in late July and continue until early September 2001, and will consist of comprehensive studies at selected streams, as discussed below, to define how the streams behave and how they change in time. The focus of the hydrology component is on descr...